Date of realisation: 2014
Investor: Coroplast Strzelce Opolskie
Project scope: Selection, delivery and assembly of a light transport system fixed to the floor without necessary foundations to be delivered. The system is equipped with a track gantry with lifting capacity of Q=1000kg and independent control.
Back

Copyright © 2009-2013 Rialex Crane Systems Powered by Coltrino CMS Designed by Misme New Media